July 2013 – Contract was signed for new building “BHD 18000”

July 2013 – Contract was signed for new building “BHD 18000”

In July 2013 Wasa Dredging started the development of a new Backhoedredger “BHD 18000”. It will be equipped with Hitachi EX3600 excavator with the possibility to mount drilling and blasting

equipment. BHD 18000 will be ready for operation in the summer 2014.

 

Last changed: 15.12.2014