30 Dec December 2011 – Contract signed for the dredging of the swing basin at Trelleborg Harbor in Sweden
The project consists of dredging of 617 000 m3 limestone of variable hardness. The material will be dumped at a key wall for transport to a landfill nearby. Design depth is -9,0 m. The contract also include an option of 80 000 m3 dredging for deepening of the entrance channel to the harbour. The project will start in June 2012.
Client: Jonab anläggning