Dredging for soil improvement for enclosure dam. Soft soils dredged until hard layer reached. Dredging is typically taking place till a depth of 17 to 23 meters below water level. The soft soils are transported to a quay wall, where the soils are unloaded by excavator and loaded into a disposal basin. Works performed on a charter